Retaining Walls, Walks and Patios in Roanoke's H-2 Historic District

Published by Roanoke Hardscape Project Guide · Page updated . Local-source review dates are shown below.

Homes in Roanoke, Virginia's historic overlay districts need City approval before most exterior hardscape work, including retaining walls, walks and other paving. This guide is for owners in Old Southwest and the other neighborhoods inside the H-2 district who are planning to repair a stone wall, replace a front walk or add a patio. It explains who the rules cover, which approval applies, what the published H-2 guidelines say about walls, walks and patios, and how to prepare an application and a project request.

Which properties fall under the City's historic district rules?

The City has two local historic overlay zoning districts, H-1 and H-2. The H-2 Architectural Guidelines explain that City Council adopted the H-2 overlay in 1987. It originally included all of Old Southwest and portions of the Mountain View and Hurt Park neighborhoods, and part of Gainsboro was added later.

The guidelines describe these neighborhoods as having small yards bounded by stone or wrought-iron fences, and streets lined with concrete or brick sidewalks. Those features are a large part of why walls and walks get close attention.

A historic look alone does not place a house in the district, and many older homes elsewhere in the City sit outside it. If you are unsure, the City's historic district applications page lists a contact for checking an address, and the City's Real Estate GIS shows zoning overlays.

What approval is needed before work on a wall, walk or patio?

The City's historic district applications page (checked October 9, 2026) says that a property in the H-1 or H-2 overlay must receive a staff- or Architectural Review Board-approved Certificate of Appropriateness, or an In-Kind Replacement and Repair approval, before any exterior work. Its list specifically includes driveways, fences, landscaping, sidewalks and walls.

The guidelines describe three review paths:

  1. In-kind replacement and repair for work that matches what is already there.
  2. Administrative (staff) approval for eligible minor work, which the guidelines say can usually be reviewed in five to ten days instead of waiting for the board's monthly meeting.
  3. Board approval for everything else.

Work cannot begin until the certificate is granted and posted at the job site. The City's patio and retaining wall permit pages also list the certificate among their submission items, so the historic approval and the zoning or building permit move together. The City permits and checks page covers the rest of those steps.

What do the H-2 guidelines say about retaining walls?

The H-2 guidelines treat existing stone retaining walls as features to keep. They say not to remove historic stone retaining walls and wrought-iron fences, and they show a stone wall as an appropriate model for the district.

For new or rebuilt retaining walls, the guidelines call for:

  • stone, reinforced or fully bonded brick, or masonry veneer over reinforced concrete block;
  • decorative concrete block only where it matches block already used in the district;
  • no logs or railroad ties for retaining walls visible from the street, though they may edge planting beds or form landscape steps.

On height, the guidelines suggest walls between 1 and 4 feet, with 2 feet 6 inches recommended for retaining walls with or without fencing, while allowing taller walls where topography demands it. A taller wall still has to meet the City's building permit and design thresholds, explained on the retaining and seating walls page.

What do the guidelines say about walks, steps and patios?

For walks, the guidelines favor repair over removal and ask that any addition match the original in materials, texture and finish, paving pattern, mortar joints and color. New concrete can be stained or tinted to match old concrete. Appropriate walk materials include brick, finished concrete, decorative pavers and flagstone, with brick or pavers suiting masonry houses and concrete suiting wood-frame houses.

For uneven walks, the guidelines suggest adding fill where settling has occurred, fixing the drainage problems that cause frost heaving, shaving minor tree roots, or rerouting the walk around major roots. They advise against placing new walks close to large trees.

Walkway steps should relate to the walk in width and material, and the guidelines recommend metal railings, such as a simple pipe rail, on walkway steps.

New patios should be placed inconspicuously at the side or rear of the house and kept compatible with it. The guidelines note that a wider range of materials is accepted at the rear and in areas not readily visible from the street. The walkways and outdoor steps page explains how walks and steps are built to stay level.

How do you prepare a historic district application and project request?

The City's H-2 application asks for a short project description explaining how the work fits the guidelines, photographs of current conditions and, for walls, fences or paving, a site plan plus a photo, sample or catalog image of the proposed material. Gathering those items early also produces a strong project request.

Useful additions include close photos of the existing stone, brick or concrete, the color and joint style of any mortar, measurements of the wall or walk, and notes on trees near the work. The H-2 Architectural Guidelines are worth reading in full before choosing materials. For other project types, start from the home page.

Local rules and sources on this page were checked on October 9, 2026. Requirements change; confirm with the responsible office before work begins.

Continue planning your Roanoke project

Browse every local planning guide · Use the printable project worksheet

Roanoke questions

Frequently asked questions

Do I need approval to repair an old stone wall in Old Southwest?

Yes, some form of approval is needed. The City requires either a Certificate of Appropriateness or an In-Kind Replacement and Repair approval before exterior work on walls in the H-1 or H-2 districts. Matching repairs typically use the in-kind path, but confirm with City staff before work starts.

Can I use pavers for a new front walk in the H-2 district?

The H-2 guidelines list decorative pavers and flagstone among appropriate walk materials, along with brick and finished concrete. They suggest brick or pavers for masonry houses and concrete for wood-frame houses, and any approval comes through the certificate process.

How long does a staff-approved certificate take?

The guidelines say eligible minor work can usually be reviewed in five to ten days rather than waiting for the board's monthly meeting. Work that is not eligible for staff approval goes to the Architectural Review Board.

Next step

Describe your historic property project

If you own a home in the historic district and are planning wall, walk or patio work, text or phone the request line with photos of the existing materials and the street view. A reviewer may help organize the details the City and a provider will both want to see. Your information goes to a provider only after you approve a named introduction. Or return to the home page.